Wednesday, November 7, 2012


CERTIFICATE OF AWARD'S ACHIEVEMENT
BACHELOR DEGREE PROGRAMME CERTIFICATE

ACHIEVEMENT AWARD

DEGREE DEAN'S AWARD

DIPLOMA DEAN'S AWARD


FINAL YEAR DEGREE 
BA ( Hons ) INTERIOR ARCHITECTURE
JIMMY CHOO ACADEMY
SCORE GRADE FOR FINAL YEAR DEGREE : 4.00 OVER 4.00
AWARD ACHIEVEMENT : - FINAL YEAR DEAN'S LIST
                                                 - GRADE POINT AVERAGE SCORED
THESIS TITTLE : RUNWAY STAGE ( ZIRCONHELIX )
SCORE GRADE FOR FINALTHESIS : 3.67 OVER 4.00

TOTAL SUBJECT/ CREDIT HOURS :  

SEMESTER 05 ( 08 SUBJECTS / 25 HOURS)
SEMESTER 06 ( 08 SUBJECTS / 23 HOURS)
SEMESTER 07 ( 06 SUBJECTS / 24 HOURS)  ( FINAL YEAR PHASE 1)
SEMESTER 08 ( 04 SUBJECTS / 20 HOURS)  ( FINAL YEAR PHASE 2 )

TOTAL SUBJECTS/CREDIT HOURS : 26  SUBJECTS / 92 HOURS EARNED
DURATION OF STUDIES : 2 YEARS ( JULY 2010 - JULY 2012 )

PROJECT PROPOSAL
SITE ANALYSSIS

BUILDING ANALYSIS

DESIGN DEVELOPMENT
CONCEPTUAL DIAGRAM

SCHEDULE OF ACCOMMODATION

FACADE

SECTION XX & YY CONCEPT DETAIL HIGHLIGHTS
SECTION X-X & Y-Y 

GROUND FLOOR LAYOUT PLAN

LOBBY AND WAITING AREA

MAIN LIBRARY AREA

FIRST FLOOR LAYOUT PLAN

EXHIHBITION II AREA

RUNWAY STAGE AREA

EXHIBITION I AREA

SECOND FLOOR LAYOUT PLAN

INSPIRATIONAL AREA

MINI LIBRARY AREA
WORKSHOP AREA 

AUDITORIUM AREA 



WORK EXPERIENCE
NAME OF THE COMPANY :
DIA - DESIGN, INTERIOR, ARCHITECTURE

DURATION OF EMPLOYMENT : 
DECEMBER 2009 - JUNE 2010

POSITION HELD :
JUNIOR DESIGNER

RESPONSIBILITIES :
AUTOCAD DRAWING
QUOTATION ( BQ )
3D MAKER
SITE MEETING
SITE SUPERVISOR 



PROJECT PROPOSAL
SALIKIN HOUSE








Client - MTBE PAVILLION

PROJECT PROPOSAL
( 3D )-AWARD & COMPLETED
Client - MTBE PAVILLION

Client - MTBE PAVILLION
( 3D ) IDEAS
TELEKOM MALAYSIA

TELEKOM MALAYSIA

TRIAGLE HOUSE
CLIENT- DATO' DR AZMAN



PROJECT PROPOSAL
( AUTOCAD DRAWING )-AWARD & COMPLETED
Client - Dr Ray

Client - Dr Ray

Client - Syed Salim

Client - Syed Salim

Client - Mohd Yunus

Client - Mohd Yunus







FINAL DIPLOMA IN INTERIOR DESIGN
DIPLOMA  PROGRAMME CERTIFICATE

PROJECT OF ROLAND MUSIC CENTRE
SCORE GRADE FOR FINAL : 3.67 OVER 4.00
AWARD ACHIEVEMENT : DEAN LIST ( APRIL 2009 )
RESEARCH THESIS TITTLE : ROLAND MUSIC CENTRE

TOTAL SUBJECT/ CREDIT HOURS :  

SEMESTER 1 ( 11 SUBJECTS / 25 HOURS)
SEMESTER 2 ( 10 SUBJECTS / 24 HOURS)
SEMESTER 3 ( 08 SUBJECTS / 25 HOURS)
SEMESTER 4 ( 09 SUBJECTS / 27 HOURS) 
SEMESTER 5 ( 01 SUBJECTS / 15 HOURS)  (PRACTICAL TRAINING )
SEMESTER 6 ( 11 SUBJECTS / 26 HOURS)  ( FINAL SEMESTER )

TOTAL SUBJECTS/CREDIT HOURS : 50 SUBJECTS /142 HOURS EARNED
DURATION OF STUDIES : 3 YEARS ( DECEMBER 2006 - DECEMBER 2009 )


PROJECT PROPOSAL
- Project Brief 
- Conceptual Board
- Building Analysis
- Site Analysis


BUILDING EXTERIOR 3D + SKETCH



LAYOUT PLAN



Second Floor Layout Plan


REFLECTED CEILING PLAN FOR
Ground Floor
First Floor
Second Floor

ELEVATION + FACADE
The top ( left ) : Left Elevation

The top ( right ) : Facade

The bottom ( left ) : Right Elevation

The bottom ( right ) : Rear Elevation




SECTION DETAIL + SECTION WITH MATERIAL ( X-X &Y-Y SECTION AREA )
Section y-y Detail
Section y-y with Material Selection
Section x-x Detail


Section y-y with Material Selection